CRITIC / CHRIS KRONER
COMPLETED / SPRING 2013
A cross-sectional analysis was performed to understand the construction and tectonics of connective infrastructure of a bridge.
The La DeVasa Footbridge (Ripoli, Spain) designed by Santiago Calatrava was explored and manipulated to perform tectonic kinetic time-based design showing precision, craft, environment and technical clarity.
This 2-minute animation titled ‘Tectonic Kinematics’ can be found at: www.vimeo.com/karlalockhart/videos
Deployment, mechanics, temporal operation and construction are the initial means of this animated investigation.